
BeforeKitchens · London
Kitchens
You've chosen the doors, the worktops and the appliances. I make sure it all goes in level, square and tight to the wall — so the kitchen looks the way it did on the drawings.

What's included
Your maker or supplier builds the kitchen. I'm the specialist who installs it — and the fit is what decides whether it looks expensive.
Still choosing a maker? Ask me — I'm happy to talk it through.
The process
Share your maker's drawings, a few photos of the room and your timescale. I'll tell you honestly whether it's a job for me.
I check walls, floors and ceilings for level and square before the kitchen arrives, so there are no surprises on fitting day.
Cabinets levelled and fixed, panels scribed, doors hung and adjusted — with your materials protected the whole way through.
Every door and drawer aligned and every gap even, then a final walk-round with you before I leave.

Projects
Homes and offices — each one shown from the rough stage to the finish.
Questions
No — I'm a specialist fitter. Your kitchen maker, joiner or supplier builds it; I install it and make sure it fits the room perfectly. If you're still choosing a maker, I'm happy to talk it through.
It depends on the size of the job and how much scribing the room needs. I'll give you a realistic timescale with your quote, before anything is booked in.
Quotes from photos and drawings are free. If I need to see the space first, there's a charge for the site visit — I'll tell you the cost up front, and it comes off the final bill if you go ahead.
Most projects I take on start from around £2,500. I don't take on extensions, skirting or small shelving jobs, so I can give proper time to the projects I do.
Yes: City & Guilds Level 3, NVQ Level 2, SMSTS, and I carry public liability insurance.
Put your preferred start date on the form and I'll be straight with you about when I can do it. Summer books up first — winter is often easier, if you're flexible.
Send a few photos or drawings and a rough idea of budget, and I'll reply within 1 working day.
Most projects I take on start from around £2,500.